swppptemplate.com

Published by Winding AI, Inc., the company that makes ePlan.

SWPPP template: which one your permit wants, and how to fill it in

Use the template your permit names. If EPA issues your permit (Massachusetts, New Hampshire, New Mexico, DC, Puerto Rico, most Indian country), that's EPA's free Word template. Texas, Florida and other states publish their own, and California requires a Qualified SWPPP Developer. Templates are free; filled-in plans run from a $49 draft to $599–$799 prepared plans and consultant quotes.

Download free: EPA SWPPP template (Word) · en español · Small Residential Lot (Word) · Texas RG-639 (Word) · EPA inspection report (Word)

Updated November 2026. Every permit fact was read from the permit or agency page, and every price from the seller's own page, on November 13, 2026.

The short list

Which template your permit wants

Read from each agency's page on November 13, 2026. Your permit's own text overrides any template.
Where the site isPermit, and when it expiresWhat the plan is calledOfficial template
EPA areas: MA, NH, NM, DC, Puerto Rico, Pacific territories, most Indian country, some federal facilities and some Oklahoma oil and gas sitesEPA 2022 CGP, to February 16, 2027SWPPPEPA SWPPP template (Word); Small Residential Lot template for up to five homes
TexasTCEQ TXR150000, to March 5, 2028SWP3RG-639 (Word or PDF, English or Spanish, May 2023)
CaliforniaOrder 2022-0057-DWQ, to August 31, 2028SWPPPNone; the Board leaves the format to the QSD
FloridaDEP generic permit (2015; a replacement is in rulemaking)SWPPPConstruction SWPPP template (an 8-page PDF guide)
WashingtonEcology CSWGP, to December 31, 2030SWPPPEcology SWPPP template (Word) and an inspection form
GeorgiaGAR100001, -2 and -3, to July 31, 2028Erosion, Sedimentation and Pollution Control PlanNone; GSWCC's 2026 checklist must be submitted with the plan
North CarolinaNCG010000, to March 31, 2029SWPPP: the approved E&SC plan plus extrasTwo sample plan sheets
ColoradoCOR400000, to March 31, 2029Stormwater management plan (SWMP)Guidance and a content checklist
VirginiaVAR10, to June 30, 2029SWPPP, with the approved erosion and stormwater plansA DEQ template, which the rule allows for common-plan sites under 1 acre
Other statesThe state's own construction general permitUsually SWPPPCheck the agency's construction stormwater page

What goes in a SWPPP: EPA's template, section by section

EPA's template follows Part 7 of its permit, and most state templates use the same order with additions. The permit, not the template, sets your obligations.

EPA Construction SWPPP Template for the 2022 CGP; appendices A to N hold the maps, forms and logs.
SectionWhat you write
1. Contacts and responsible partiesEvery operator and the area it controls; the stormwater team, each member's duties and training.
2. Site evaluation and planningAcres disturbed, receiving waters and discharge points, the work and its dated schedule, non-stormwater discharges, site maps.
3. Other federal requirementsEndangered species eligibility, historic property screening, underground injection controls.
4. Erosion and sediment controlsFifteen subsections, from buffers and perimeter controls to dewatering and stabilization: the control, its spec, maintenance and schedule.
5. Pollution preventionSpills, fueling, washing, materials and waste, washout, fertilizers.
6. Inspection and corrective actionWho inspects, how often, the rain gauge, corrective action and delegation of authority.
7. Turbidity monitoringOnly for dewatering discharges to sensitive waters.
8. CertificationThe signature of the operator's authorized signatory.

The requirements checklist maps each item to its permit part, and the SWPPP example shows every section filled in for an invented 1.75-acre site.

How to fill it in, in order

  1. Confirm the permit and get its template. EPA's Appendix B lists EPA's areas; elsewhere, your state's construction stormwater page has the template and forms.
  2. Check whether you need one. An acre or more, or less inside a larger common plan, needs coverage; 1 to 5 acres may waive out if the erosivity factor is under 5 (when a SWPPP is required).
  3. Describe the site and schedule from your grading plan: area disturbed to the nearest quarter acre, the most disturbed at one time, and dates for each phase.
  4. Find your receiving waters and whether they're impaired, with EPA's How's My Waterway. That can change your inspection schedule.
  5. Clear the species and historic screens before the NOI: USFWS IPaC and NOAA Fisheries for species, Appendix E's four steps for historic properties.
  6. Specify each control with a cited spec, its maintenance and install date, and draw it on the site map with flow arrows.
  7. Name a qualified inspector and the schedule. Under EPA's permit the inspector must pass EPA's free course or hold a current equivalent certification (inspection forms).
  8. Sign, file and keep it current. File the NOI (how), post the site notice, and update the plan within 7 days of any change.

Nine ways to get a SWPPP, side by side

Prices in US dollars from each seller's own page, read November 13, 2026. "Filled in" means the option writes your site's facts, not just blank headings.
OptionWhat you getFilled in for your sitePriceWho signs or prepares
EPA SWPPP templateWord template for EPA's 2022 CGP, with instructions in each field; separate inspection and corrective action templatesNo you write itFreeYou, in most EPA areas; New Mexico adds a qualified-preparer condition
State templatesFree templates, guides or checklists from state agencies, such as TCEQ's RG-639 (Word), Washington Ecology's (Word) and Florida DEP's (PDF)No you write itFreeDepends on the state
ePlanA drafted SWPPP from four questions and public data; the NOI and an inspection form are drafted as separate documents; Word downloadYes draft, marked for you to checkFree to read (up to 3 projects); $49 per document; Pro $99/moYou or your QSD reviews and signs; not stamped
CaseMark SWPPP skillA free, open-source instruction file that has an AI assistant draft a SWPPP from your project detailsFrom what you give itFree file; or run in CaseMark's Para from $20/seat/moYou review and sign
Smart SWPPPA prepared plan from your uploaded plans; site notices; NOI preparationYes prepared for you$599 under 5 acres, $699 5+ acres (Austin); $799 (New Mexico, Ohio); NOI $99Smart SWPPP prepares; you sign
SWPPP consultant or QSDA site-specific plan, often with inspections and permit filingYesBy quote; one firm publishes $2,500–$5,000 for sites under 5 acresThe consultant; required in California (QSD)
US Legal Forms / pdfFillerFillable copies of agency SWPPP templates in a forms library and PDF editorNoFrom $8/mo billed yearly; $15/mo with pdfFillerYou
Mitti (SafetyCulture)Inspection app with a free SWPPP inspection checklist; not a plan writerNo inspections onlyFree up to 10 users; $24/seat/mo yearly, $29 monthlyYour inspector
ComplianceGoStormwater inspection app and a free library of state inspection formsNo inspections only30-day free trial; price on requestYour inspector

Each option in a paragraph

EPA SWPPP template

Best if EPA issues your permit

A Word file covering every Part 7 item, with instruction text in each field and 14 appendices for maps, forms and logs. In a state with its own program it's a good model but not your form. The shorter Small Residential Lot version is for builders of up to five homes, each disturbing under an acre, away from sensitive waters.

EPA templates and tools

State templates

Best in a state that publishes one

Texas's RG-639 (May 2023) is the most complete: worksheets keyed to each permit part, in Word or PDF, English or Spanish (Texas guide). Washington's is a Word file that predates its 2026 permit; Florida's is an 8-page PDF guide; Georgia requires its checklist instead; California publishes none. Check any template's date against the permit's.

ePlan

Best for a filled-in first draft at the lowest price

ePlan asks four questions (site, acres, what you're building, grading dates) and fills in the rest from public data: which permit applies, the receiving water and its impairments, the design storm, soils and slope. The draft follows EPA's or the state's template and marks what to check or fill in; the NOI and an inspection form are drafted next as separate documents. Reading is free (up to 3 active projects); each Word file is $49, so the SWPPP, NOI and form are $147, or Pro is $99 a month for unlimited downloads.

Where it falls short: the draft isn't stamped, ePlan doesn't draw the site map, and its terms say the signer must check every draft. In California a QSD still has to prepare and certify the plan.

ePlan's SWPPP page · Pricing

CaseMark SWPPP skill

Best if you already draft with an AI assistant

A free, Apache 2.0 instruction file from the legal AI company CaseMark (its old SWPPP page redirects here). It looks nothing up, so the facts are only what you supply. It also runs in CaseMark's Para, from $20 a seat a month.

CaseMark's SWPPP skill

Smart SWPPP

Best for a done-for-you plan at a published price

Upload your plans and get a prepared SWPPP in 48 to 72 hours. Prices sit on its market pages, not a pricing page (which returns 404): $599 under 5 acres and $699 for 5 or more in Austin, $799 in New Mexico and Ohio, $99 for an NOI alone.

Smart SWPPP, Austin pricing

SWPPP consultant or QSD

Required in California; best for basins, dewatering or sensitive waters

A consultant writes the plan, often draws the sheets, and can file and inspect. Pro SWPPP, one such firm, publishes $2,500 to $5,000 for sites under 5 acres and $150 to $500 per inspection; see the cost guide.

US Legal Forms and pdfFiller

Only if you use the library for other forms too

Fillable copies of agency templates, from $8 a month billed yearly or $15 with the pdfFiller editor. The agency file is free and current.

US Legal Forms pricing

Mitti (SafetyCulture)

Best free app for the weekly inspections

A SWPPP inspection checklist with photos and reports, free for up to 10 users, then $24 a seat a month billed yearly. It runs inspections; it doesn't write the plan.

Mitti pricing

ComplianceGo

Best for contractors inspecting many sites

A stormwater inspection app with weather data and free state inspection forms; 30-day free trial, then pricing on request.

ComplianceGo state forms

Where ePlan fits, and where it doesn't

ePlan is the better choice when

  • You'd write the plan yourself anyway and want the public-data facts filled in first.
  • You want to read the whole draft before paying, and pay $49 for the SWPPP draft rather than $599 or more for a prepared plan.
  • You need the SWPPP, NOI and inspection form to agree.

Pick something else when

  • You're in California: hire a QSD (ePlan's draft can be their start).
  • You want it all done for you: Smart SWPPP or a consultant.
  • You need drawn sheets or an engineered basin: a consultant or engineer.

One date to know: February 16, 2027

EPA's 2022 permit expires at 11:59 p.m. on February 16, 2027. Under the 2027 permit EPA proposed on August 3, 2026, sites in EPA's areas file a new NOI that includes the SWPPP, a link to it, or its site map and signed certification. State permits keep their own schedules (what changes in 2027).

Questions

Is there a free SWPPP template?

Yes. EPA's construction SWPPP template is a free Word file for sites under EPA's permit, and many states publish their own, such as TCEQ's RG-639 in Texas. Use the one your permit names.

Can I write my own SWPPP?

In most places, yes: the permit names who must sign and who may inspect, not who must write it. The exceptions: California requires a Qualified SWPPP Developer, Georgia a certified design professional, and in New Mexico EPA's permit adds a state condition that a qualified erosion control specialist prepare it. See who can write a SWPPP.

How much does a SWPPP cost?

From $0 for an agency template you fill in yourself, to $49 for an ePlan draft, $599 to $799 for a Smart SWPPP plan, and consultant quotes that one firm puts at $2,500 to $5,000 under 5 acres. Permit fees and inspections come on top (cost guide).

Does a SWPPP need an engineer's stamp?

Usually not: EPA's permit, Texas and Florida name no professional who must stamp it. Georgia's plan carries a design professional's seal on every sheet, and engineered features like sediment basins may need an engineer.

Guides

How we checked

On November 13, 2026 we read EPA's 2022 permit, its appendices and template, the 2027 proposal, each state agency's permit and template, and each product's own pricing page. The top Google results for "SWPPP template" that day were form directories and copies of templates; none said which template applies or how to fill it in. We gave no scores or star ratings. Corrections: support@winding.ai.

About this page

This page is published by Winding AI, Inc., the company that makes ePlan, one of the nine options compared here. We make money when someone pays ePlan to download a document or subscribes; we earn nothing from links to agencies or other products, and links to ePlan carry a tag so ePlan can count visits from this page. Nothing here is legal or engineering advice: your permit's text governs.