Who can write a SWPPP? QSDs, preparers and inspectors by state

In most places, anyone can write a SWPPP: EPA's permit and most state permits say who must sign it and who may inspect, not who writes it. Three exceptions: California (a Qualified SWPPP Developer), Georgia (a certified design professional) and New Mexico (a qualified erosion control specialist, under EPA's permit). Inspectors more often need a certificate.

Updated November 13, 2026. Sources: the 2022 EPA CGP (Parts 4.1, 6.3 and 9.6.1) and its Appendix G, EPA's inspector training page, and each state permit linked in the table notes below.

Three jobs, three sets of rules

So the person who signs carries the liability whoever drafted it. A consultant, a superintendent, a template or a software draft can all produce the words; the signer has to check them.

Preparer and inspector rules, by permit

Read from each permit and agency page on November 13, 2026. "None named" means the permit names no license or certification for that role.
PermitWho may write the planWho inspectsBase inspection schedule
EPA 2022 CGP (most EPA areas)None named; "good engineering practices"Passed EPA's course and exam, or an equivalent current certificationEvery 7 days, or 14 days plus within 24 hours of 0.25 in of rain
EPA CGP in New MexicoQualified erosion control specialists (for example a CPESC or a suitably trained engineer); qualifications documented in the SWPPPAs EPAAs EPA
CaliforniaQualified SWPPP Developer (QSD)QSD, QSP, or someone the QSP trainedWeekly, plus before, during and after qualifying storms
GeorgiaDesign professional (Georgia-licensed engineer, architect, landscape architect, forester, geologist or surveyor, or a CPESC) with GSWCC Level II certificationGSWCC-certified personnel (Level IA)Every 7 days and within 24 hours of 0.5 in, plus daily checks of fuel areas and exits
TexasNone named; each operator signsSomeone "knowledgeable of this general permit," the site and the SWP3Every 14 days plus within 24 hours of 0.5 in, or every 7 days
FloridaNone namedA qualified inspector: DEP's training, an equivalent course, or relevant experienceEvery 7 days and within 24 hours of 0.5 in
WashingtonNone namedA Certified Erosion and Sediment Control Lead (CESCL)Weekly and within 24 hours of any discharge
VirginiaNone named beyond "good engineering practices"; a certified Responsible Land Disturber is named to the local authorityDEQ-certified personnel or EPA's course (since July 1, 2025)Every 5 business days, or 10 plus within 24 hours of 0.25 in
North CarolinaNone named in the permit; the SWPPP builds on an approved erosion and sedimentation control planNo certification required, DEQ saysEvery 7 days and within 24 hours of 1.0 in
ColoradoNone named; the plan names a Qualified Stormwater ManagerA Qualified Stormwater Manager (knowledge, no state certificate)Every 7 days, or 14 days plus after storms that cause erosion

Stricter schedules apply near impaired or high-quality waters in most of these permits. Permits: Texas TXR150000, California 2022-0057-DWQ, Georgia GAR100001-3, Florida's generic permit, Washington CSWGP, Virginia VAR10, North Carolina NCG01, Colorado COR400000.

The certifications, briefly

Writing your own: when it makes sense

Where the permit allows it, writing your own SWPPP works for a simple site: one phase, no sediment basin, no dewatering, no impaired or high-quality receiving water. Use the template your permit names, read each instruction, and look up the facts (receiving water, impairments, species, historic properties, soils) rather than guessing. It gets harder fast: a basin, a TMDL, a steep site or several operators are when a consultant earns their fee.

A middle route is a filled-in draft you check and sign. ePlan drafts one from four questions and public data, marked where you must check, pick or fill in; it's free to read and $49 to download, and it isn't stamped, so in California or Georgia it's a starting point for the required professional (ePlan's SWPPP page). What each route costs is in the cost guide; California's QSD rules are in detail in the California SWPPP guide.

Questions

Does a SWPPP have to be prepared by an engineer?

Not under EPA's general terms or in Texas, Florida, Washington, North Carolina or Colorado's permits. Georgia requires a design professional, which can be a licensed engineer or a CPESC; California requires a QSD; New Mexico, under EPA's permit, requires a qualified erosion control specialist.

Who signs the SWPPP?

The operator's signatory: a responsible corporate officer, general partner, proprietor or public agency executive, or a representative they authorize in writing. Each operator signs, or all sign a shared plan.

Can my superintendent do the inspections?

Yes, if they meet the permit's inspector rule: EPA's course or an equivalent certificate under EPA's permit, a CESCL in Washington, Level IA in Georgia, and DEQ certification or EPA's course in Virginia.

About this page

This guide is published by Winding AI, Inc., the company that makes ePlan, one of the ways to get a SWPPP drafted that this site compares. We make money when someone pays ePlan to download a document or subscribes; we earn nothing from links to agencies or other products, and links to ePlan carry a tag so ePlan can count visits from here. Every fact on this page was read from the source it links to on the date shown above.